SolutionGetTotalScheduledWorkTime Method |
Returns the total amount of time scheduled to all
employees. If a break has a 'WorkLength' different to
the actual physical length of the break then the break's
'WorkLength' is used rather than the actual physical length.
For example, if a break has a WorkLength of zero then that
time will not be included.
Namespace:
SRS.ShiftSolver.Core
Assembly:
ShiftSolver (in ShiftSolver.dll) Version: 2.2.0.0
Syntax public double GetTotalScheduledWorkTime()
Public Function GetTotalScheduledWorkTime As Double
public:
double GetTotalScheduledWorkTime()
member GetTotalScheduledWorkTime : unit -> float
Return Value
Type:
DoubleThe total time in minutes.
See Also