Click or drag to resize

SolutionGetTotalScheduledWorkTime Method

Returns the total amount of time scheduled to all employees. If a break has a 'WorkLength' different to the actual physical length of the break then the break's 'WorkLength' is used rather than the actual physical length. For example, if a break has a WorkLength of zero then that time will not be included.

Namespace:  SRS.ShiftSolver.Core
Assembly:  ShiftSolver (in ShiftSolver.dll) Version: 2.2.0.0
Syntax
public double GetTotalScheduledWorkTime()

Return Value

Type: Double
The total time in minutes.
See Also

www.staffrostersolutions.com | support